STAGE 09 / 16 · ACT 3 · Deliver

Implementation and construction

Implement the design while managing the security risks of the delivery period. Construction and installation can create temporary exposures. Keep changes controlled and retain the evidence needed for testing and operational handover.

What to do at this stage

  1. 01

    Manage site access, temporary arrangements and transition risks during delivery.

  2. 02

    Record installation evidence and resolve departures from the agreed design.

  3. 03

    Refer material design changes back to assessment before treating them as routine substitutions.

Questions to work through

  • What new exposure exists during the transition?
  • Does the installation match the agreed design?
  • Which changes require the risk assessment to be revisited?
AN EXAMPLE IN PRACTICE

When an existing perimeter is opened for construction, document the temporary protection and the person responsible for maintaining it until the permanent control is restored.

A common trap

The risk during implementation may be different from both the original risk and the intended final state.

When the work needs to return

Suggested resources

Selected for their likely use at this stage. Resource associations are guidance, not a compliance crosswalk.

Keep the whole life cycle in view

These practical prompts are editorial guidance for the navigator. Consult the published SRMBOK life cycle guide and charts for the full method. About this edition and its sources.

KEEP BUILDING YOUR PRACTICE

A useful next step, in your inbox.

New SRMBOK resources and practical security risk management guidance.

Free to join. Sign up on SRMBOK. Unsubscribe any time.
Join the free newsletter